Station configuration checked before it reaches site.

For protection, substation automation and commissioning engineers. Your relay vendor tools stay as they are.

Standards
IEC 61850 · IEC 62443
Station files
SSD, ICD, IID, SCD, CID, SED
Records
COMTRADE 1991, 1999 and 2013
Works with
SCL from PCM600, System Configurator and other IEC 61850 tools
Deployment
Self-hosted, your cloud or air-gapped

What your team gets

IEC 61850 engineering without leaving the IDE.

Govern features are in use today. Domain modules are pre-release; their state is listed under Tools and formats.

Station configurationSCL files read, indexed, edited and compared natively from IEC 61850-6, with the rest of each file kept byte for byte.
Schema and consistency checksFiles validated against your copy of the IEC schema and checked for references, names and address clashes before they are issued.
GOOSE and Sampled ValuesCaptures decoded and checked against the station file.
Disturbance recordsCOMTRADE records viewed with cursors, phasors and events, and downloaded from the relay over MMS.
Read-only commissioningIEDs browsed online over MMS, including secure connections, without writing to them.

Who uses it

One environment for every role on the team.

Protection engineersCompare relay settings held in the SCL file, as issued against as left.
Substation automation engineersConfigure IEC 61850 systems from the SCL files.
Commissioning engineersCheck GOOSE and Sampled Values traffic against the design.
Analysis engineersRead disturbance records after an event.

Tools and formats

What the Energy module handles, and how far each is verified.

The module is behind a setting, off by default. Loading a CID file to a relay goes through the relay vendor's tool.

SCL station filesReader, index, schema validation and checks verified on 292 public sample files, including PCM600 and Siemens System Configurator exports. The editors and the single line view are modelled.SSD · ICD · IID · SCD · CID · SED
Online IEDsBrowsing, reports and record retrieval over MMS, read-only. Verified against open-source IEC 61850 servers on Linux; no relay has been connected.MMS · MMS over TLS
Records and capturesThe COMTRADE reader and writer are checked against an independent reader, and the GOOSE and Sampled Values decoder against tshark.COMTRADE · GOOSE · Sampled Values · pcap
Relay vendor toolsPCM600 SCD export and import driven through its command line. Kit shipped: not yet run against PCM600.Hitachi Energy PCM600

No relay vendor tool or relay has been run, and no customer project opened. The module's checks are its own, not a vendor tool's acceptance. Domain modules are pre-release. Nothing is verified by a customer yet, and nothing is verified on Windows. Do not rely on a capability for production work until it is verified for your tools, versions and operating system. Product names belong to their owners.

How a change moves

A person decides before anything leaves the desk.

  1. Propose
    An engineer or agent drafts a change to station configuration.
  2. Verify
    Schema and consistency checks run on the files before issue.
  3. Approve
    A push to the issued configuration waits for a named approver.
  4. Record
    Change, results and approval kept together in the audit record.

Standards

Evidence for your engineering process. Conformance is yours.

IEC 61850Station files checked against the IEC 61850-6 schema and the module's own rules. Conformance testing of devices stays with you and the vendors.
IEC 62443Evidence toward IEC 62443: agent rules keep agents off the station and plant networks you name, and every change keeps its approver.

Neural Inverse provides evidence toward these standards. Certification stays with your organisation and assessor.

Talk to our team.

Neural Inverse is available by request. We work with your engineering, security and procurement teams from the first conversation.

Energy and utilities · Neural Inverse